
In high-density urban areas, ensuring the waterproofing of foundations can present unique challenges, especially when access is limited. Fortunately, the COLPHENE BSW BASE system offers a solution tailored to these complex situations. Designed for the waterproofing of horizontal and vertical external blindside walls, this fully reinforced pre-applied system guarantees effective and durable protection.
This installation video provides a step-by-step guide to implementing this system while addressing key points.
Updates
The COLPHENE BSW-V and COLPHENE BSW-H membranes now deliver enhanced performance under their new names: COLPHENE BSW-V PLUS and COLPHENE BSW-H PLUS.
As COLPHENE PROTECT'R has been discontinued, follow the steps at 3:54: Install COLPHENE FLAM 180 or a second layer of COLPHENE BSW-H PLUS over the COLPHENE BSW-H PLUS membrane to protect the primary waterproofing membrane.
Watch this demonstration to master essential techniques and maximize the performance of your waterproofing systems!