Case Study
14posts
Find out how the SOPREMA Protected Wall Assembly helped meet the construction challenges of the new Old Crow Health and Wellness Centre!
The Halifax Grammar School, founded in 1958, is an institution of independent learning for over 570 students, from kindergarten through Grade 12.
In May 2020, SOPREMA completed the construction of its brand-new sealant manufacturing plant in Woodstock (ON). Covering an area of 10,015 m2, the buil ...
Case study on the largest residential passive building in Canada. SOPREMA products have contributed to its PHIUS+ 2015: Passive Building Standard.
Resurfacing: Case study on the mitigation of environmental impacts and the economic and social gains measured as part of the CF Champlain Mall project.
The MEC extensive green roof was installed in 1998 in Toronto, as part of MEC’s commitment to promoting new green building technologies.
After four years of hard work and collective effort, the Samuel-De Champlain Bridge was opened to traffic in the summer of 2019.
Discover why SOPREMA’s high-density polyiso cover boards were chosen to construct the Agropur Cooperative in Longueuil.
The construction team of the Halifax Hospice, the very first hospice in the city, put their trust in SOPREMA for the building’s insulation.