PROJECT GROUP
Lead Architect: Anne Sinclair
General Contractor: Lindsay Construction
Applicator: MJM Energy
Application: Insulation (walls & ceilings)
SOPREMA Representative: Jen Rocca
SOPREMA SYSTEM
Products: SOPRA-CELLULOSE & SOPRA-SPF 201
Accessory products: SOPRA-CELLULOSE strip & SOPRA-CELLULOSE patch
Quantity: 1 500 ft² (SOPRA-CELLULOSE), 20 000 ft² (SOPRA-SPF 201)
Duration: Fall 2017 to spring 2019
Statut: Opening scheduled for April 2019