Context
Canada’s road infrastructure is subject to harsh conditions that accelerate its aging, such as repeated freeze-thaw cycles, exposure to de-icing salts, and heavy traffic loads. For municipalities, government agencies and infrastructure managers, choosing the right waterproofing system is, therefore, a strategic decision that helps minimize future maintenance and extend the service life of structures.
Find out how SOPREMA’s ANTIROCK BASE system was used to successfully repair an overpass in Brockville, Ontario, thanks to a simplified installation method, controlled application and long-lasting protection against water infiltration.
Successful Integration of the ANTIROCK Waterproofing System into an Infrastructure Project in Ontario
Completed in 2025, the rehabilitation of an overpass in Brockville demonstrates that a prefabricated waterproofing solution can meet the requirements of infrastructure projects in Ontario while streamlining site operations. SOPREMA’s ANTIROCK BASE was selected to protect the deck, as it offers an effective alternative to hot rubber waterproofing systems, with an optimized installation and improved quality control.
Consisting of ANTIROCK SEALANT, ANTIROCK PRIMER, and a heat-welded ANTIROCK 200M membrane, the system was installed with automated equipment to ensure uniform application across the entire treated surface. In total, nearly 1,400 m² of ANTIROCK membrane was used.
Carried out by Groupe Lefebvre, a leading specialist in the installation of membranes for civil engineering works, the project demonstrates how easily the ANTIROCK system can be integrated into the rehabilitation of existing infrastructure.
The Construction Site in Pictures
What Is the ANTIROCK Membrane?
ANTIROCK is a heat-welded waterproofing membrane composed of SBS-modified bitumen and an integrated non-woven polyester reinforcement. This design helps simplify the installation process while ensuring long-lasting protection of the deck against water infiltration. Read the ANTIROCK brochure to learn more about the product.
A Proven Technology Worth Considering
The overpass rehabilitation project in Brockville relies on technology that has already demonstrated its effectiveness under Canadian conditions.
In Québec alone, more than 1,000,000 m² of ANTIROCK membranes have been installed since 2018 on structures exposed to weather conditions comparable to those found in Ontario.
This real-world experience confirms the system’s ability to meet the demands placed on Canadian infrastructure, both in new construction and in rehabilitation projects. SOPREMA’s ANTIROCK BASE system has notably been used on major projects in Québec, including the Samuel-De Champlain Bridge and the Louis-Hippolyte-La Fontaine Tunnel.
Discover other large-scale projects featuring ANTIROCK solutions.
An Alternative to Hot-Applied Systems That Simplifies Work
Hot-applied rubberized waterproofing systems remain widely used in infrastructure projects in Ontario. However, prefabricated membranes now offer a different approach that streamlines installation while ensuring long-lasting protection.
Unlike traditional products, which require reinforcement to be installed separately between different layers of asphalt, ANTIROCK integrates this reinforcement directly into the prefabricated membrane. This design reduces the number of steps required on site, simplifies the installation process, and promotes uniform application, while also contributing to better quality control and easier coordination of operations.
Comparison of Installation Methods: Hot-Applied Systems vs. the ANTIROCK BASE System
| Criterion | Hot-applied system (hot rubber) | ANTIROCK BASE system |
|---|---|---|
| Reinforcement | Installed separately between the layers of asphalt | Integrated into the prefabricated membrane |
| Hot material handling | Required | Not required |
| Installation procedure | Several application steps carried out on site | Simplified installation thanks to a prefabricated membrane |
| Quality control | Dependent on multiple installation steps | More uniform application thanks to a prefabricated membrane |
| Coordination of work | Several operations to organize | Streamlined installation process |
| Application of the asphalt after installation | Dependent on-site conditions | Possible immediately after installation (depending on site conditions) |
Watch a time-lapse video of the ANTIROCK membrane installation.
©Photo credit: Paul Dionne. All rights reserved.
A System Designed with the Realities of the Construction Site in Mind
.« We have been installing SOPREMA’s ANTIROCK waterproofing system for over 30 years, and its track record speaks for itself. The quality and consistency of the product, combined with mechanized installation, put this system ahead of hot-applied rubberized liquid membrane systems. We achieve the same efficiency, if not better, with a much smaller crew. Paving contractors also prefer it because it allows their equipment to move around the site much more easily than when protection boards are used. »
Philippe Lefebvre, VP – Civil and Industrial
Project Description
- Name of the project: Rehabilitation of an Overpass in Brockville
- Type of work: Civil engineering
- City: Brockville, Ontario
- Year of the works: 2025
- Total installed product area: Approximately 1,400 m²
Project Group
- Contractor: KB Civil Constructors, Inc.
- Installer: Groupe Lefebvre
- SOPREMA technical representative: François Messier