The Zoo Road viaduct bridge crosses Beijing Zoo, as a part of the infrastructure for Beijing 2008 Olympic Games. The waterproofing area is about 27,000 ft2, and completed October 2007. The waterproofing layer was installed by Soprema Macaden Automatic Installation System with 200 meter long SBS modified bitumen membrane—Antirock.